Service prices

Home » Services » Service prices

Pricelist of the services offered to residential and business customers by CEZ Distribution BulgariaAD

№ of order Name of the service Price of the service net VAT VAT Price of the service VAT included
1 2 3 4 5
Electricity supply and sale services
1 Connection of temporary movable facilities:      
1.1 atLVside with direct metering  62.80 12.56 75.36
  with indirect metering 138.60 27.72 166.32
1.2 at MV side 732.03 146.41 878.44
2 Change in tariff in case of indirect metering from T1 to T2, when a two-tariff electricity meter available and absence of a tariff switch. 24.22 4.84 29.06
3

Change in tariff from 2Т to

 

10.66 2.13 12.79
4 Change in tariff in case of indirect metering from T2 or T3 to a lower one. 41.94 8.39 50.33
5 Replacement of a one-tariff to two-tariff electricity meter and assembly of a tariff switch. 42.14 8.43 50.57
6 Change in tariff in case of indirect metering from 1T or 2T to 3T. 126.9 25.38 152.28
7 Technical checking requested by a customer 46.78 9.36 56.14
8 Technical checking of CMD (commercial metering device) on location when requested by a customer      
8.1. - with indirect metering      
  - checking without a calibrator 62.87 12.57 75.44
  - checking with a calibrator 118.69 23.74 142.43
8.2. - with direct metering      
  - checking without a calibrator 34.97 6.99 41.96
  - checking with a calibrator 62.87 12.57 75.44
9 Examination of an electricity meter when requested by a customer and preparation of a Statement of Findings from HDMMD      
  Thepriceisformedas 9.1+ 9.2 ( totalprice = price of the electricity distribution company + price HDMMD)      
9.1 - for the electricity distribution company 46.78 9.36 56.14
9.2 - for the Head Directorate Measures and Metering Devices (pursuant to tariff 11, enclosure 2)        
  - single-phase electricity meters     15.00
  - three-phase electricity meters     30.00
  - three-phase combo electricity meters for active and reactive electricity     75.00
10 Assembly of an additional section to the electricity metering board for additional devices 111.44 22.29 133.73
11 Resumption of the supply of electricity to a customer disconnected for an outstanding bill      
  - from electricity meter or a fuse 33.38 6.68 40.06
  - from external network 39.53 7.91 47.44
  - by operative switch 140.80 28.16 168.96
12 Express resumption of the supply of electricity to a customer disconnected for an outstanding bill – up to 6 hours      
  - from electricity meter or a fuse 66.78 13.36 80.12
  - from external network 79.06 15.82 94.88
  - from a switchgear 217.28 43.46 260.74
  - by operative switch 281.60 56.32 337.92
13 Temporary disconnection and resumption of electricity supply when requested by the customer      
  - from electricity meter or a fuse 33.38 6.68 40.06
  - from external network 39.53 7.91 47.44
  - from a switchgear 108.64 21.73 130.37
  - by operative switch 140.49 28.10 168.59
14 Termination of the subscription of a customer with termination of electricity supply and safeguarding      
  - direct metering from electricity meter 36.98 7.40 44.38
  - direct metering from external network 56.73 11.35 68.08
  -LVindirect metering 89.62 17.92 107.54
  - MV indirect metering 168.05 33.61 201.66
15 Metering the volume of electricity at LV level (duration – seven days and nights)      
  - single-phase supply 87.74 17.55 105.29
  - three-phase supply – direct metering 102.86 20.57 123.43
  - three-phase supply – direct metering 133.48 26.70 160.18
16 Assembly of control metering devices      
16.1 Property of the customer      
  - -direct metering 112.93 22.59 135.52
  -  indirect metering 230.61 46.12 276.73
16.2 Property of the electricity distribution company      
  - direct metering 275.36 55.07 330.43
  - LV indirect metering 1,061.03 212.21 1,273.24
  - MV indirect metering 1480.90 296.18 1777.08

 

PRICELIST № 2

Pricelist of the services offered by the technical and survey departments of CEZ Distribution Bulgaria AD

for connecting generators and electricity customers

No Name of the service Price of the service net VAT VAT Price of the service VAT included
1 2 7 8 9
1 Survey works on external electricity supply, giving technical instructions and issuing a capacity certificate      
1.1 up to 15 kW 66.13 13.23 79.36
1.2 up to 50 kW 79.99 16.00 95.99
1.3 up to 100 kW 103.11 20.62 123.73
1.4 up to 500 kW 184.00 36.80 220.80
1.5 up to 1 000 kW 322.67 64.53 387.20
1.6 up to 5 000 kW 710.95 142.19 853.14
1.7 over 5 000 kW 930.80 186.16 1116.96
2 Giving technical advice to designers, design instructions and design revision      
2.1 within 2 hours 55.47 11.09 66.56
2.2 per each following hour 27.73 5.55 33.28
3 Survey on location with designs and investors in connection to design development and execution      
3.1 within 3 hours 86.93 17.39 104.32
3.2 over 3 hours 107.73 21.55 129.28
4 Participation in an acceptance committee 128.53 25.71 154.24
5 Submission of data from the technical database      
5.1 within 2 hours 55.47 11.09 66.56
5.2 per each following hour 27.73 5.55 33.28
6 Issuing a statement for 72-hour dry-run and for DNCS 41.60 8.32 49.92
7 Agreement of electricity meter board      
7.1 electricity meter board LV 25.92 5.18 31.10
7.2 electricity meter board MV 37.96 7.59 45.55
8   Agreement of external connection for electricity supply 0.00 0.00 0.00
9 Agreement of a Detailed Site Development Plan,construction regulation plans of residential areas 120.00 24.00 144.00

PRICELIST No 2

 

Top
Menu:
Search:

Choose your language: Български

Main navigation: